Interpreting MARSSIM: Final Status Survey Units for Small, Irregular Contamination

I’m planning a final status survey for a small concrete pad (approx. 10m x 10m) used for temporary storage of potentially contaminated components. Scans identified two isolated beta-gamma hotspots (each <100 cm²). The rest of the area is background.

Approach: Following MARSSIM, I’m using a grid-based approach for the Class 1 area.

For the two small hotspots, does it make more sense to:
1. Treat each as its own separate survey unit (SU) due to their distinct, elevated activity?
2. Include them within the larger grid SU and just ensure the statistical test (e.g., Sign test) still passes with their elevated DCGL values?

Looking for practical experience on how this is typically justified in an FSS report to satisfy regulator expectations.